3.05.2008

Bathroom Remodel

The remodeling of our main bathroom began today with the bathtub and shower surround being replaced. An extra, adjustable, shower head was also installed. It looks much nicer than what we previously had even though the drywall still needs to be finished around the tub and shower surround. We are also replacing the vanity and sink, but those have not arrived yet. They should really help to improve the look and functionality of the bathroom as well.

No comments: